Hf3 Construction, Inc.

Herb Fletcher went from trusting his gut on fireproofing bids to producing 375% more of them — in less time, at lower cost.
Hf3 Construction case study: revenue up 30 percent in four months with The EDGE
Case Study

375% More Bids. 83% Less Time. How Hf3 Construction Transformed Their Estimating

Hf3 Construction started as a small commercial construction company in 2001 and expanded into fireproofing two years later. Owner and sole estimator Herb Fletcher had spent years piecing bids together with PlanSwift and Excel — what he called “a really bad version of The EDGE.” After five years of searching for something better, he found Estimating Edge through a supplier recommendation and never looked back.

The numbers are hard to argue with: Fletcher now produces 375% more bids per month, spends 83% less time per bid, and cut his cost-per-bid from $1,200 to a fraction of that. Within four months of adopting The EDGE, revenue was already up 30% — and climbing. “We could be tripling our revenue. It’s THAT good,” Fletcher said.

Read the Full Story

Keep Reading

More Case Studies

Estimating EDGE and Roofers Coffee Shop contractor case studies video series
Hargrove Roofing
Meet Danny Boyle — roofing estimator, project manager, and the first contractor to share his story on Contractor Success Stories.
read more
Nevell Group, Inc. case study with workers in safety vests on a job site
Flame icon Fireproofing
Nevell Group, Inc.
A commercial interior and exterior wall system, specialty ceiling and fireproofing contractor uses The EDGE®. Prior to The EDGE, Chris Valvo, Senior Fireproofing Estimator and Project Manager, was creating takeoffs using OST and then calculating everything by hand.
read more
Yorkshire Federal case study: from first request to final estimate in 2 hours or less
Yorkshire Federal
Carl Morse traded pencil, paper, and spreadsheets for The EDGE — and now closes estimates in 2 hours or less.
read more